Railways in Southern British Columbia: Difference between revisions
From AlanMacek.com Canyon
No edit summary |
(up to end of Ch6 MW) |
||
Line 21: | Line 21: | ||
*Spring - C&K completed to Nelson {{MW|p=24}} | *Spring - C&K completed to Nelson {{MW|p=24}} | ||
*Silver found in Sandon {{WP|Kaslo and Slocan Railway|link}} | *Silver found in Sandon {{WP|Kaslo and Slocan Railway|link}} | ||
*Two railroads chartered to build to Nicola that both died. Nicola Valley Railway (backed by CPR) [Spences Bridge to Nicola] and Nicola, Kamloops & Similkameen Coal & Railway Company (indep.) [Kamloops to Nicola to Princton and Osoyoos] {{MW|p88}} | |||
===1892=== | ===1892=== | ||
*S&O - built from Sicamous to Vernon - only know built before or during 1893. {{MW|p=27}} | *Shuswap & Okanagan (S&O) - built from Sicamous to Vernon - only know built before or during 1893 (CPR). {{MW|p=27}} | ||
*N&S receives charter {{WP|Nelson and Slocan Railway|link}} | *N&S receives charter {{WP|Nelson and Slocan Railway|link}} | ||
===1893=== | ===1893=== | ||
Line 73: | Line 74: | ||
===1901=== | ===1901=== | ||
*March 28 - Dunsmiur announces subsidy award for Kootenay and coast railway {{MW|p=56}} | *March 28 - Dunsmiur announces subsidy award for Kootenay and coast railway {{MW|p=56}} | ||
*May 11 - Midway & Vernon (M&V) (independent) receives provincial charter.{{MW|p=81}} Subsidy increased in spring 1902 but no construction yet. | |||
*May 23 - Kettle River Valley Railway receives federal Charter and Republic & Kettle River (US) by Holland {{MW|p=68}} | *May 23 - Kettle River Valley Railway receives federal Charter and Republic & Kettle River (US) by Holland {{MW|p=68}} | ||
*June - Great Northern gains complete control of VV&E {{MW|p=58}} | *June - Great Northern gains complete control of VV&E {{MW|p=58}} | ||
Line 84: | Line 86: | ||
*CPR builds from Nelson to Proctor {{MW|p=256}} | *CPR builds from Nelson to Proctor {{MW|p=256}} | ||
*April 12 - KRVR-R&KR completes Grand Forks to Republic (US) {{MW|p=73}} | *April 12 - KRVR-R&KR completes Grand Forks to Republic (US) {{MW|p=73}} | ||
*W&GN (GN) completes from Carson (Grand Forks) to Republic {{MW|p=74}} | |||
*June - Dunsmuir charters Vancouver & Coast-Kootenay Railway for BC McLean brothers. {{MW|p=62}} | *June - Dunsmuir charters Vancouver & Coast-Kootenay Railway for BC McLean brothers. {{MW|p=62}} | ||
*June 9 - VV&E comples from Cascade to Carson (south of Grand Forks) (GN) {{MW|p=74}} | *June 9 - VV&E comples from Cascade to Carson (south of Grand Forks) (GN) {{MW|p=74}} | ||
*November 9 - GN crosses KRVR tracks | *November 9 - GN crosses KRVR tracks into Grand Forks, which KRVR blocks by parking locomotive across {{MW|p=64+}} | ||
*November GN completed to Granby [''Peter''] | *November GN completed to Granby Smelter (at Grand Forks) [''Peter''] | ||
*Columbia River bridge completed at Robson [''Peter''] | *Columbia River bridge completed at Robson [''Peter''] | ||
*CPR builds Kootenay and Arrowhead from Lardeau to Gerrard [''Peter''] {{SKL|179}} | *CPR builds Kootenay and Arrowhead from Lardeau to Gerrard [''Peter''] {{SKL|179}} | ||
*late - Tracy Holland resigns as head of Kettle Valley {{MW|p=76}} | |||
''Note: Kettle River Valley Railway (CDN) and Republic & Kettle River Railway (US) were merged into single entity called Kettle Valley Lines'' | |||
===1903=== | ===1903=== | ||
*September - Vancouver & Coast-Kootenay Railway starts token construction {{MW|p=63}} | *September - Vancouver & Coast-Kootenay Railway starts token construction {{MW|p=63}} | ||
*October - Vancouver & Coast-Kootenay dies | *October - Vancouver & Coast-Kootenay dies | ||
*William Hamilton Merritt revives charter for Nicola, Kamloops & Similkameen Coal & Railway Company (see 1891) | |||
===1904=== | |||
*January 1 - Midway & Vernon (independent) starts token construction at Vernon - one man with wheelbarrow to sustain charter{{MW|p=82}} built 1/4 of mile over several years | |||
===1905=== | |||
*June 20 - grading starts on Spences Bridge to Nicola railway NK&S {{MW|p=91}} | |||
*July 5 - M&V starts construction from Midway end (under McLean brothers) {{MW|p=83}} | |||
*November - M&V completes grading from Midway to Rock Creek {{MW|p=84}} but did not get further. Officially disolved in 1927. {{MW|p=86}} | |||
*November 12 - CPR leases NK&S from Mr. Merritt. CPR talks of connecting it to Midway. {{MW|p=90}} | |||
===1906=== | ===1906=== | ||
*CPR's Nicola Branch under construction {{MW|p=64+}} | *CPR's Nicola Branch under construction {{MW|p=64+}} | ||
*January 8 - NK&S starts laying track at Spences Bridge up Nicola | |||
*June 16 - Kettle Valley starts slowly building north from Grand Forks {{MW|p=77}} | |||
*October 31 - NK&S approved between Spences Bridge and Coutlee {{MW|p=92}} | |||
===1907=== | ===1907=== | ||
*CPR's Nicola Branch completed {{MW|p=64+}} | *CPR's Nicola Branch completed {{MW|p=64+}} | ||
*January 22 - first coal leaves Nicola Valley {{MW|p=94}} | |||
*April - NK&S starts operation to Nicola {{MW|p=92}} | |||
*June 24 - Kettle Valley Lines completes track through Grand Forks {{MW|p=77}} | |||
*end of summer - KVL built to 18 miles north of Grand Forks {{MW|p=77}} | |||
*general depression causes drop in copper prices so KVL suspends operating to Republic {{MW|p=78}} | |||
==1910s== | ==1910s== | ||
===1911=== | ===1911=== | ||
Line 110: | Line 130: | ||
*April - construction just east of Princton {{MW|p=64+}} | *April - construction just east of Princton {{MW|p=64+}} | ||
*April 23 - Last spike on Midway to Merrit section at Princeton {{MW|p=64+}} | *April 23 - Last spike on Midway to Merrit section at Princeton {{MW|p=64+}} | ||
*May 31 - offical opening of the Kettle Valley Railway {{MW|p=64+}} | *May 31 - offical opening of the Kettle Valley Railway {{MW|p=64+}} trains operating between Summerland and Princeton {{MW|p=96+}} | ||
*September - Slide Creek Bridge (m31.8) Coquihalla Subdivision under construction {{MW|p=96+}} | |||
*December - construction on Coquihalla pass but not completed until 1916 (work restarted in May 1916) {{MW|p=96+}} | |||
===1916=== | |||
*May - work restarts on finishing Coquihalla pass {{MW|p=96+}} | |||
*July - work still ongoing on Coquihalla pass {{MW|p=96+}} | |||
*July late - work done on Coquihalla pass {{MW|p=96+}} | |||
==1920s== | ==1920s== | ||
===1920=== | |||
*October - Copper Mountain Subdivision opens {{MW|p=96+}} | |||
==1930s== | ==1930s== | ||
===1931=== | ===1931=== | ||
Line 125: | Line 153: | ||
===1977=== | ===1977=== | ||
*CPR bargeslip at Lardeau abandoned {{SKL|179}} | *CPR bargeslip at Lardeau abandoned {{SKL|179}} | ||
==1980s== | |||
===1980=== | |||
*track between Merritt and Nicola (the Nicola spur) removed {{MW|p=261}} | |||
===1988=== | |||
*Merritt's station closed {{MW|p=261}} | |||
==1990s== | |||
===1991=== | |||
*track between Spences Bridge and Penticton pulled up {{MW|p=261}} |
Revision as of 23:13, 31 January 2005
1880s
1883
- CPR reaches British Columbia from the east by end of season
- Northern Pacific completes mainline (via Sandpoint, Spokane) [Peter]
1884
- CPR reaches Rogers Pass by end of season
1885
- November, 7 - Last spike in Eagle Pass, November 7, 1885
1887
- Hall brothers discover silver near Nelson(McCulloch's Wonder, p19)
1888
- April - Corbin gets charter for Spokane Falls & Northern Railway(McCulloch's Wonder, p21)
1889
- SF&N reaches Little Dalles(McCulloch's Wonder, p21)
- Columbia & Kootenay Steam Navigation Company (CKSN) founded, serving SF&N (McCulloch's Wonder, p24)
1890s
1890
- August, 20 - CPR charters Columbia & Kootenay Railway (McCulloch's Wonder, p24)
- James Baker obtains BC charter for British Columbia Southern Railway (McCulloch's Wonder, p22)
1891
- Spring - C&K completed to Nelson (McCulloch's Wonder, p24)
- Silver found in Sandon (')
- Two railroads chartered to build to Nicola that both died. Nicola Valley Railway (backed by CPR) [Spences Bridge to Nicola] and Nicola, Kamloops & Similkameen Coal & Railway Company (indep.) [Kamloops to Nicola to Princton and Osoyoos] (McCulloch's Wonder, p{{{p}}})
1892
- Shuswap & Okanagan (S&O) - built from Sicamous to Vernon - only know built before or during 1893 (CPR). (McCulloch's Wonder, p27)
- N&S receives charter (')
1893
- December - N&FS opens to Five Mile Point (McCulloch's Wonder, p26)
- Great Northern Railway mainline completed (via Jennings, Bonners Ferry, Sandpoint, Spokane) (McCulloch's Wonder, p28)
- August, Northern Pacific Railway bankrupt (McCulloch's Wonder, p29) and obtained by Great Northern (McCulloch's Wonder, p44)
1894
- October - N&S reaches Three Forks (')
1895
- April - K&S construction started (McCulloch's Wonder, p32)
- October, late - K&S reaches Sandon (McCulloch's Wonder, p32)
- December, 15 - N&S reaches Sandon (McCulloch's Wonder, p32)
1896
- January - C&W charter for Trail to Penticton by Heinze (McCulloch's Wonder, p35)
- Trail smelter built by Heinze (McCulloch's Wonder, p34)
- Rossland to Trail narrow gauge built by Heinze (McCulloch's Wonder, p34)
- December - CPR buys CKSN (McCulloch's Wonder, p37)
- CPR buys BCSR charter (McCulloch's Wonder, p38)
- CPR signs Crows Nest Agreement with federal government (McCulloch's Wonder, p39)
- Vancouver businessmen charter Vancouver, Victoria & Eastern Railway & Navigation Company (VV&E) from Vancouver to Kootenays (McCulloch's Wonder, p40)
- December - Heinz starts construction on C&W (McCulloch's Wonder, p41)
- CPR builts Revelstoke to Arrowhead (The Skyline Limited, p49)
1897
- June, 16 - Heinz (C&W) fails in merger with VV&E (McCulloch's Wonder, p41)
- September 23 - Mackenzie & Mann acquire controlling interest in VV&E (McCulloch's Wonder, p45)
- C&K completed up Slocan Valley to Slocan City (')
- September - Heinz's C&W connects Trail to Robson West [Peter]
1898
- February - Heinz sells Rossland, smelter, and half C&W to CPR (McCulloch's Wonder, p42)
- March 19 - Corbin charters Kettle River Valley Railway in US to connect Boundary with his SF&N but denied Canadian portion (McCulloch's Wonder, p43)
- June 15 - VV&E (Mann) agrees to build from Miday to Coast, CPR agrees to build from Kootenays only to Midway (McCulloch's Wonder, p47)
- June 27 - VV&E starts construction at Penticton (McCulloch's Wonder, p47)
- July 1 - Great Northern obtains control of Corbin's SF&N (McCulloch's Wonder, p44)
- October 15 - Last spike on CPRs Crows Nest to Kootenay Landing railway built in just over year (McCulloch's Wonder, p44)
- late - CPR works on C&W (McCulloch's Wonder, p48)
1899
- early - CPR works on C&W (McCulloch's Wonder, p48)
- February 27 - new BC Government (Semlin) cancels subsidies to VV&E (McCulloch's Wonder, p48)
- June - Shaughnessy succeeds Van Horne as president of the CPR (McCulloch's Wonder, p48)
- September 18 - CPR complets C&W to Grand Forks, grading to Midway (McCulloch's Wonder, p49)
1900s
1900
- early - CPR has track to Midway and Eholt (McCulloch's Wonder, p49)
- January - CPR surveys from Midway to Hope (McCulloch's Wonder, p50)
- May - Granby Consolidated Mining & Smelting Company opens first mine at Phoenix (McCulloch's Wonder, p65)
- June - James Dunsmiur becomes BC premier (McCulloch's Wonder, p53)
- August - Granby Consolidated opens smelter in Grand Forks (McCulloch's Wonder, p65)
- December 13 - VV&E sold to Great Northern and CPR announces plan for Vancouver & Grand Forks (McCulloch's Wonder, p54)
1901
- March 28 - Dunsmiur announces subsidy award for Kootenay and coast railway (McCulloch's Wonder, p56)
- May 11 - Midway & Vernon (M&V) (independent) receives provincial charter.(McCulloch's Wonder, p81) Subsidy increased in spring 1902 but no construction yet.
- May 23 - Kettle River Valley Railway receives federal Charter and Republic & Kettle River (US) by Holland (McCulloch's Wonder, p68)
- June - Great Northern gains complete control of VV&E (McCulloch's Wonder, p58)
- July - GN starts construction on Washington & Great Northern (US) north up Kettle River to Canada from Marcus(WA). Also started building from GN mainline to Crowsnest area.(McCulloch's Wonder, p58)
- July - BC Government commissions Edgar Dewdney to survey Hope Mountains for a railway route (McCulloch's Wonder, p59)
- August 31 - Construction starts on Kettle River Valley Railway (McCulloch's Wonder, p68)
- October 28 - KRVR-R&KR receives first locomotive (McCulloch's Wonder, p68)
1902
- January 2 - KRVR-R&KR reaches Curlew (McCulloch's Wonder, p69)
- January - GN blocked from Grand Forks by KRVR
- CPR builds from Nelson to Proctor (McCulloch's Wonder, p256)
- April 12 - KRVR-R&KR completes Grand Forks to Republic (US) (McCulloch's Wonder, p73)
- W&GN (GN) completes from Carson (Grand Forks) to Republic (McCulloch's Wonder, p74)
- June - Dunsmuir charters Vancouver & Coast-Kootenay Railway for BC McLean brothers. (McCulloch's Wonder, p62)
- June 9 - VV&E comples from Cascade to Carson (south of Grand Forks) (GN) (McCulloch's Wonder, p74)
- November 9 - GN crosses KRVR tracks into Grand Forks, which KRVR blocks by parking locomotive across (McCulloch's Wonder, p64+)
- November GN completed to Granby Smelter (at Grand Forks) [Peter]
- Columbia River bridge completed at Robson [Peter]
- CPR builds Kootenay and Arrowhead from Lardeau to Gerrard [Peter] (The Skyline Limited, p179)
- late - Tracy Holland resigns as head of Kettle Valley (McCulloch's Wonder, p76)
Note: Kettle River Valley Railway (CDN) and Republic & Kettle River Railway (US) were merged into single entity called Kettle Valley Lines
1903
- September - Vancouver & Coast-Kootenay Railway starts token construction (McCulloch's Wonder, p63)
- October - Vancouver & Coast-Kootenay dies
- William Hamilton Merritt revives charter for Nicola, Kamloops & Similkameen Coal & Railway Company (see 1891)
1904
- January 1 - Midway & Vernon (independent) starts token construction at Vernon - one man with wheelbarrow to sustain charter(McCulloch's Wonder, p82) built 1/4 of mile over several years
1905
- June 20 - grading starts on Spences Bridge to Nicola railway NK&S (McCulloch's Wonder, p91)
- July 5 - M&V starts construction from Midway end (under McLean brothers) (McCulloch's Wonder, p83)
- November - M&V completes grading from Midway to Rock Creek (McCulloch's Wonder, p84) but did not get further. Officially disolved in 1927. (McCulloch's Wonder, p86)
- November 12 - CPR leases NK&S from Mr. Merritt. CPR talks of connecting it to Midway. (McCulloch's Wonder, p90)
1906
- CPR's Nicola Branch under construction (McCulloch's Wonder, p64+)
- January 8 - NK&S starts laying track at Spences Bridge up Nicola
- June 16 - Kettle Valley starts slowly building north from Grand Forks (McCulloch's Wonder, p77)
- October 31 - NK&S approved between Spences Bridge and Coutlee (McCulloch's Wonder, p92)
1907
- CPR's Nicola Branch completed (McCulloch's Wonder, p64+)
- January 22 - first coal leaves Nicola Valley (McCulloch's Wonder, p94)
- April - NK&S starts operation to Nicola (McCulloch's Wonder, p92)
- June 24 - Kettle Valley Lines completes track through Grand Forks (McCulloch's Wonder, p77)
- end of summer - KVL built to 18 miles north of Grand Forks (McCulloch's Wonder, p77)
- general depression causes drop in copper prices so KVL suspends operating to Republic (McCulloch's Wonder, p78)
1910s
1911
- July 1 - Construction starts on Kettle Valley Railway (McCulloch's Wonder, p64+)
1913
- spring - Trout Creek Bridge near Summerland under construction (McCulloch's Wonder, p64+)
- December - construction starts on Fraser River bridge at Hope (McCulloch's Wonder, p64+)
1914
- Myra Canyon trestles under construction (McCulloch's Wonder, p64+)
- October - Railway complete between Penticton and Midway (McCulloch's Wonder, p64+)
1915
- April - construction just east of Princton (McCulloch's Wonder, p64+)
- April 23 - Last spike on Midway to Merrit section at Princeton (McCulloch's Wonder, p64+)
- May 31 - offical opening of the Kettle Valley Railway (McCulloch's Wonder, p64+) trains operating between Summerland and Princeton (McCulloch's Wonder, p96+)
- September - Slide Creek Bridge (m31.8) Coquihalla Subdivision under construction (McCulloch's Wonder, p96+)
- December - construction on Coquihalla pass but not completed until 1916 (work restarted in May 1916) (McCulloch's Wonder, p96+)
1916
- May - work restarts on finishing Coquihalla pass (McCulloch's Wonder, p96+)
- July - work still ongoing on Coquihalla pass (McCulloch's Wonder, p96+)
- July late - work done on Coquihalla pass (McCulloch's Wonder, p96+)
1920s
1920
- October - Copper Mountain Subdivision opens (McCulloch's Wonder, p96+)
1930s
1931
- CPR completes railway between Proctor and Kootenay Landing along Kootenay Lake (McCulloch's Wonder, p256)
1940s
1942
- Kootenay & Arrowhead (K&A) abandoned from Lardeau and Gerrard (The Skyline Limited, p179)
1950s
1960s
1967
- track at Hope ends just east of Station, abandoned earlier (McCulloch's Wonder, p64+)
1970s
1977
- CPR bargeslip at Lardeau abandoned (The Skyline Limited, p179)
1980s
1980
- track between Merritt and Nicola (the Nicola spur) removed (McCulloch's Wonder, p261)
1988
- Merritt's station closed (McCulloch's Wonder, p261)
1990s
1991
- track between Spences Bridge and Penticton pulled up (McCulloch's Wonder, p261)